Construction of Tehran (Shariati-Khaje Abdullah) by Pipejacking Method
Client: Tehran Wastewater Company
Consultant: Mahab Ghodss Consulting Engineers Co.
Type of Contract: C (Construction)
Location: Tehran, between Shariati and Khaje Abdullah Ansari streets
Status: Completed
Project Overview
Tehran Sewerage Pipeline Project started from Shariati Street, Mirdamad Intersection to the south and after passing through Golanbey Street, Ketabi Square and Mojtabaei Street, it ended at the intersection of Shahid Araghi Street on Khawaja Abdollah Ansari Street. The total length of the project according to the contract is 3,982 meters and the total number of manholes is 34, which was implemented using the pipe laying method using micro tunneling devices. The material of the pipelines is polymer concrete with diameters of 1,600 and 1,800 millimeters. To provide the required pipes, Kayson Company has set up a production line in its satellite factories.
During the operations, the Client of the project also notified Kayson Company of the execution of 530 meters of 1,400 millimeter lines located on Mirdamad Street as additional work.
Scope of Work
Obtaining and reviewing aerial survey maps, drawings of urban facilities and existing studies on the length of pipeline construction
Conducting various geological tests related to excavation techniques
Obtaining the relevant permits from the sewerage company, municipalities of regions 3 and 4, and the traffic department
Design and construction of Reception and Drive Shafts
Installation of equipment in and around Reception and Drive Shafts
Construction of Manholes
Project Statistics
| Earthworks | 12,220 m³ |
| Concreting | 5,000 m³ |
| Formwork | 6,000 m² |
| Reinforcement | 320 t |
| 1800 mm polymer concrete pipe | 1,256 m |
| 1600mm polymer concrete | 2,170 m |
| 1400mm polymer concrete | 566 m |