Al-Teymour (Mashhad) Wastewater Treatment Plant

Al-Teymour (Mashhad) Wastewater Treatment Plant

Client: Mashhad Water and Wastewater Company
Financial provider:Islamic Development Bank (IDB)
Fourth agent: Karavar-kavoshpey JV development Co.
Consultant: Pars Ab Tadbir Consulting Engineering Company (P.A.T)
Partner: Mushrif of Kuwait
Type of contract: DBO (Design, Build & Operation) Location: Khorasan Province, Mashhad
Status: Completed

Project Overview

Mashhad Al-Teymour Wastewater Treatment Plant project is a Design, Build, and Operate (DBO) contract, which includes the design, purchase of required equipment, construction, transportation, and installation, and one year of operation and maintenance of the project after receiving the Final Acceptance Certificate.

This project was completed in several stages:

  • Phase One: Design, Purchase, and Implementation of the Project over 36 months
  • Phase Two: Training, Pre-commissioning, and Testing
  • Phase Three for 12 months: Operation and Maintenance

With the operation of Mashhad City Wastewater Treatment Plant (Al-Teymour), a wastewater treatment capacity of 80,000 cubic meters per day (which can be increased to 167,000 cubic meters per day) has been built in Al-Teymour Mashhad region. In the first phase, a model was built in the form of a project; in such a way that the wastewater treatment capacity of a population of about 472,000 people was provided. The full exploitation of this project will meet the needs of about one million people in Mashhad within the project horizon.

Wastewater treatment in this project is carried out using the MLE (Modified Ludzack-Ettinger) method, and its main units include waste and particle filters, primary sedimentation tanks, aeration tanks, secondary sedimentation tanks, sludge units, and control and monitoring and administrative buildings, warehouses, repair shops, and security.

This treatment plant has been defined to increase the following criteria:

  • Achieving national health standards
  • Using the output of the project as a source for irrigating 4445 hectares of agricultural land

Scope of Work

  • Project design in the fields of process, architecture, civil, mechanical, electrical and instrumentation
  • Purchase and installation of specialized project equipment
  • Carry out civil and construction operations
  • One year of operation

Project Statistics

Earth work 220,000 m³
Concreting 27,000 m³
Formwork 45,000 m²
Reinforcement 2,800 t
Office & Ancillary Buildings 1,100 m²