Construction of Tehran (Shariati-Khaje Abdullah) by Pipejacking Method

Construction of Tehran (Shariati-Khaje Abdullah) by Pipejacking Method

Client: Tehran Wastewater Company
Consultant: Mahab Ghodss Consulting Engineers Co.
Type of Contract: C (Construction)
Location: Tehran, between Shariati and Khaje Abdullah Ansari streets
Status: Completed

Project Overview

Tehran Sewerage Pipeline Project started from Shariati Street, Mirdamad Intersection to the south and after passing through Golanbey Street, Ketabi Square and Mojtabaei Street, it ended at the intersection of Shahid Araghi Street on Khawaja Abdollah Ansari Street. The total length of the project according to the contract is 3,982 meters and the total number of manholes is 34, which was implemented using the pipe laying method using micro tunneling devices. The material of the pipelines is polymer concrete with diameters of 1,600 and 1,800 millimeters. To provide the required pipes, Kayson Company has set up a production line in its satellite factories.

During the operations, the Client of the project also notified Kayson Company of the execution of 530 meters of 1,400 millimeter lines located on Mirdamad Street as additional work.

Scope of Work

Obtaining and reviewing aerial survey maps, drawings of urban facilities and existing studies on the length of pipeline construction

Conducting various geological tests related to excavation techniques

Obtaining the relevant permits from the sewerage company, municipalities of regions 3 and 4, and the traffic department

Design and construction of Reception and Drive Shafts

Installation of equipment in and around Reception and Drive Shafts

Construction of Manholes

Project Statistics

Earthworks 12,220 m³
Concreting 5,000 m³
Formwork 6,000 m²
Reinforcement 320 t
1800 mm polymer concrete pipe 1,256 m
1600mm polymer concrete 2,170 m
1400mm polymer concrete 566 m