{"id":1105,"date":"2024-09-25T08:52:53","date_gmt":"2024-09-25T08:52:53","guid":{"rendered":"https:\/\/kwe.kayson.group\/en\/?post_type=project&#038;p=1105"},"modified":"2025-12-06T14:14:48","modified_gmt":"2025-12-06T10:44:48","slug":"al-kifil-treatment-plant","status":"publish","type":"project","link":"https:\/\/kwe.kayson.group\/en\/project\/al-kifil-treatment-plant\/","title":{"rendered":"Al-Kifil Water Treatment Plant and Transmission Lines"},"content":{"rendered":"<p><strong>Project Overview<\/strong><\/p>\n<p>Al-Kifil Water Treatment Plant and Transmission Lines Project is located in Babylon Province, 150 kilometers south of Baghdad and 50 kilometers from the city of Najaf.<\/p>\n<p>The Kifil Water Treatment Plant has a capacity of 4,000 cubic meters per hour (equivalent to 88,000 cubic meters per day) and a covered population of about 560,000 people and is fed by the Euphrates River.<\/p>\n<p>The purified water from this treatment plant is transported to the cities and districts of Kifil, Bani Muslim, Marqed Nabi through 56 kilometers of transmission lines, which are located at the beginning of the primary pumping station due to the distance between the water intake and the treatment plant.<\/p>\n<p><strong>Scope of Work<\/strong><\/p>\n<ul>\n<li>Project design in the fields of process, architecture, civil, mechanical, electrical, etc.<\/li>\n<li>Instrumentation<\/li>\n<li>Purchase and installation of specialized project equipment<\/li>\n<li>Civil and construction operations<\/li>\n<li>One-year operation and maintenance<\/li>\n<\/ul>\n<p><strong>Project Statistics<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td>Length of transmission line<\/td>\n<td>56 km<\/td>\n<\/tr>\n<tr>\n<td>Concreting<\/td>\n<td>25,000 m\u00b3<\/td>\n<\/tr>\n<tr>\n<td>Reinforcement<\/td>\n<td>2,000 t<\/td>\n<\/tr>\n<tr>\n<td>Formwork<\/td>\n<td>15,000 m\u00b2<\/td>\n<\/tr>\n<tr>\n<td>Logistics and administrative buildings area<\/td>\n<td>1,880 m\u00b2<\/td>\n<\/tr>\n<tr>\n<td>Earth work (pipelines and treatment plant)<\/td>\n<td>193,000 m\u00b3<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Client: Ministry of Municipalities and Public Works\/ Water Directorate<br \/>\nConsultant: Pouya Tadbir Arya Engineering Company \/ Axiom Engineering Company<br \/>\nType of Contract: Turnkey, EPC (Engineering, Procurement &#038; Construction)<br \/>\nLocation: Babylon Province, Iraq<\/p>\n","protected":false},"featured_media":1373,"template":"","project_cat":[],"class_list":["post-1105","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/project\/1105","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/media\/1373"}],"wp:attachment":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/media?parent=1105"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/project_cat?post=1105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}