{"id":1107,"date":"2024-09-25T10:48:27","date_gmt":"2024-09-25T10:48:27","guid":{"rendered":"https:\/\/kwe.kayson.group\/en\/?post_type=project&#038;p=1107"},"modified":"2026-01-18T14:06:43","modified_gmt":"2026-01-18T10:36:43","slug":"tehran-shariati-khaje-abdullah-pipejacking","status":"publish","type":"project","link":"https:\/\/kwe.kayson.group\/en\/project\/tehran-shariati-khaje-abdullah-pipejacking\/","title":{"rendered":"Construction of Tehran (Shariati-Khaje Abdullah) by Pipejacking Method"},"content":{"rendered":"<p style=\"text-align: left;\"><strong>Project Overview<\/strong><\/p>\n<p style=\"text-align: left;\">Tehran Sewerage Pipeline Project started from Shariati Street, Mirdamad Intersection to the south and after passing through Golanbey Street, Ketabi Square and Mojtabaei Street, it ended at the intersection of Shahid Araghi Street on Khawaja Abdollah Ansari Street. The total length of the project according to the contract is 3,982 meters and the total number of manholes is 34, which was implemented using the pipe laying method using micro tunneling devices. The material of the pipelines is polymer concrete with diameters of 1,600 and 1,800 millimeters. To provide the required pipes, Kayson Company has set up a production line in its satellite factories.<\/p>\n<p style=\"text-align: left;\">During the operations, the Client of the project also notified Kayson Company of the execution of 530 meters of 1,400 millimeter lines located on Mirdamad Street as additional work.<\/p>\n<p style=\"text-align: left;\"><strong>Scope of Work<\/strong><\/p>\n<p style=\"text-align: left;\">Obtaining and reviewing aerial survey maps, drawings of urban facilities and existing studies on the length of pipeline construction<\/p>\n<p style=\"text-align: left;\">Conducting various geological tests related to excavation techniques<\/p>\n<p style=\"text-align: left;\">Obtaining the relevant permits from the sewerage company, municipalities of regions 3 and 4, and the traffic department<\/p>\n<p style=\"text-align: left;\">Design and construction of Reception and Drive Shafts<\/p>\n<p style=\"text-align: left;\">Installation of equipment in and around Reception and Drive Shafts<\/p>\n<p style=\"text-align: left;\">Construction of Manholes<\/p>\n<p style=\"text-align: left;\"><strong>Project Statistics<\/strong><\/p>\n<table class=\" alignleft\" style=\"border-collapse: collapse; width: 100%; height: 270px;\">\n<tbody>\n<tr style=\"height: 42px;\">\n<td style=\"width: 50%; height: 42px;\">Earthworks<\/td>\n<td style=\"width: 50%; height: 42px;\">12,220 m\u00b3<\/td>\n<\/tr>\n<tr style=\"height: 42px;\">\n<td style=\"width: 50%; height: 42px;\">Concreting<\/td>\n<td style=\"width: 50%; height: 42px;\">5,000 m\u00b3<\/td>\n<\/tr>\n<tr style=\"height: 42px;\">\n<td style=\"width: 50%; height: 42px;\">Formwork<\/td>\n<td style=\"width: 50%; height: 42px;\">6,000 m\u00b2<\/td>\n<\/tr>\n<tr style=\"height: 42px;\">\n<td style=\"width: 50%; height: 42px;\">Reinforcement<\/td>\n<td style=\"width: 50%; height: 42px;\">320 t<\/td>\n<\/tr>\n<tr style=\"height: 42px;\">\n<td style=\"width: 50%; height: 42px;\">1800 mm polymer concrete pipe<\/td>\n<td style=\"width: 50%; height: 42px;\">1,256 m<\/td>\n<\/tr>\n<tr style=\"height: 42px;\">\n<td style=\"width: 50%; height: 42px;\">1600mm polymer concrete<\/td>\n<td style=\"width: 50%; height: 42px;\">2,170 m<\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 50%; height: 18px;\">1400mm polymer concrete<\/td>\n<td style=\"width: 50%; height: 18px;\">566 m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Client: Tehran Wastewater Company<br \/>\nConsultant: Mahab Ghodss Consulting Engineers Co.<br \/>\nType of Contract: C (Construction)<br \/>\nLocation: Tehran, between Shariati and Khaje Abdullah Ansari streets<br \/>\nStatus: Completed<\/p>\n","protected":false},"featured_media":1367,"template":"","project_cat":[],"class_list":["post-1107","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/project\/1107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/media\/1367"}],"wp:attachment":[{"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/media?parent=1107"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/kwe.kayson.group\/en\/wp-json\/wp\/v2\/project_cat?post=1107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}